DI:7.2 CONCEPT EVALUATION
Ȧã§ãX§ãAfter design concepts have been developed they must be reviewed.
When evaluating concepts, we are best to start with many concepts and then refine,
DI:7.2.1 Decision Matrix
Basically we set some criteria, give them a value, and then compare conceptual designs to it. The final results are numerical.
4. A score is given to the concept for each criteria. The ranking is done relative to one of the design concepts, with the middle of the scale being the first concept. A scale of -3 to +3 is reasonable.
5. Using the criteria weights, the column values are multiplied and added to get a score for the design.