eNotes: Automated Manufacturing Systems
   



TOC PREV NEXT

AS:9.3 SHOP FLOOR CONTROL


No factory is perfect, and a schedule can become invalid at any time because of,

- Machine breakdown
- Sudden material shortage
- Workforce vacancy
- Tool breakage
- etc.

What to do about it,

- Wait and See
- Try to find alternative production plans/parts
- Ask engineering for replan
- Bump other jobs
- ?????

AS:9.3.1 Shop Floor Scheduling - Priority Scheduling

Instead of scheduling before production (MRP and Capacity planning), a manufacturer may opt to do scheduling on the fly.

Some of these methods include,

- Earliest operation due date - soonest date. This gives time until due, but ignores processing time.
- Order Slack - soonest date minus processing time. This gives the amount of time to play with.
- Shortest operation first - Do the quickest jobs first. This just clears out WIP faster.

AS:9.3.2 Shop Floor Monitoring

It is important to know what is happening on the factory floor.

To do this we must pay attention to obvious problems like machine operation, and hidden problems such as quality, and production quantities.

Inspection covers a number of areas,

- Inspection of raw materials
- Inspection of manufactured product
- preprocess
- in-process
- post process
- Inspection of production process parameters
- tools
- fixtures
- production machinery
- Verification/calibration
- inspection fixtures
- Inspection gauges
- Inspection machinery

TOC PREV NEXT

Search for More:

Custom Search